Return on Renovation Costs...How much will you get back?

Return on renovation costs: How much will you get back?


Projects that can increase -- or decrease -- the value of your home.


Percentage recovered upon resale
Kitchen upgrade: 75% to 100%
Bathroom upgrade: 75% to 100%
Interior painting: 50% to 100%
Roof replacement: 50% to 80%
Replacement of furnace or heating system: 50% to 80%
Expansion (addition of family room): 50% to 75%
Doors and windows: 50% to 75%
Deck: 50% to 75%
Installation of hardwood floor: 50% to 75%
Construction of a garage: 50% to 75%
Fireplace (wood or gas) 50% to 75%
Central air conditioning: 50% to 75%
Finished basement: 50% to 75%
Wood fence: 25% to 50%
Interlocking paving stones on driveway: 25% to 50%
Landscaping: 25% to 50%
Asphalt driveway: 20% to 50%
Pool: 10% to 40%
Skylights: 0% to 25%


information provided by: www.styleathome.com

Comments:
No comments

Post Your Comment:

Categories
The data relating to real estate on this website comes in part from the MLS® Reciprocity program of either the Real Estate Board of Greater Vancouver (REBGV), the Fraser Valley Real Estate Board (FVREB) or the Chilliwack and District Real Estate Board (CADREB). Real estate listings held by participating real estate firms are marked with the MLS® logo and detailed information about the listing includes the name of the listing agent. This representation is based in whole or part on data generated by either the REBGV, the FVREB or the CADREB which assumes no responsibility for its accuracy. The materials contained on this page may not be reproduced without the express written consent of either the REBGV, the FVREB or the CADREB.